Image
Home arrow Latest News
Latest News
Recycling system changes
Thursday, 27 May 2010

Changes to the recycling system introduced this year are being imposed by contractors Biffa. The original idea was to “stream” all materials for recycling on site, with separate bins for cardboard, paper, cans and plastic. But the contractors are now going to take all the “household” recyclables  together, for streaming off-site.

This means that all the wheelie bins currently labelled cardboard, plastics, food and drink cans and paper will be replaced by bins labelled “Dry mixed recycling.”

Read more...
 
The roof is on
Thursday, 27 May 2010

1005building.jpgWork on the new office building continues to progress apace. Now there is cladding on, the roof is on, and work is going on inside, including installing plumbing systems, underfloor heating, partition walls and stairs.

The project is still running to schedule, and within the next month or so we should see windows going in and Siberian larch cladding adding the finishing touch to the exterior walls.

 
New slipway policy
Friday, 30 April 2010

Slipway signboardA new notice setting out rules which should help to reduce congestion in the area and so cause less inconvenience to berth holders and other marina users has been put in place at the top of the new slipway (near the berthing master’s cabin).

In addition, barrier gates have been installed at the old slipway, which will be closed at evenings and weekends to reduce congestion and nuisance to West Harbour berth holders.

 

 

 

 

Read more...
 
Marquee in place
Friday, 30 April 2010

The new marqueeA new marquee has been erected alongside the Harbour Room, and will remain in place throughout the summer, until after Clarke and Carter’s autumn Yacht Fair.

The marquee doubles the floor space of the Harbour Room, and will be put to good use during events like the Classic Regatta and the Felixstowe Regatta, and functions staged by organisations including East Anglian Sailing Trust, the RYA and of course Haven Ports YC. The facilities are also available for private hire for wedding receptions etc.

The new marquee makes the Harbour Room complex all the more attractive and versatile as it faces the waterside.

 
New radar tops new building
Friday, 30 April 2010

Office Building April 2010Work on the new office building is continuing at an impressive rate, still right on schedule for autumn occupation. The new roofline is now clearly visible, and one of its features is a new radar scanner.

The Ipswich Port Authority’s scanner on top of the office building has been a familiar SYH landmark for some 30 years – but the new building boasts a brand new scanner.

 

Read more...
 
Security stepped up
Friday, 30 April 2010

A number of new security cameras have been installed around the site – including a second camera at the entrance. One of the two cameras concentrates on cars and the other one on number plates – a valuable reinforcement of existing security systems.

 
<< Start < Prev 1 2 3 Next > End >>

Results 1 - 10 of 26

Harbour Weather

Temperature 17.4 °C
Humidity 49 %
Dewpoint 6.6 °C
Wind NE at 2.5 kt
Barometer 1019.5 mb
  & Steady
Daily Rain 0.0 mm
Rain Rate 0.0 mm/hr
Updated 16:27 03 Sep